Maximum versatility, minimum deck area
Meet Osprey. Designed for wind installation vessels
Safeway Osprey is designed to offer a state of the art offshore motion compensated gangway system for large offshore construction vessels. Self-sustained with integrated HPU and control station, the unit can be relocated at any location on any deck to meet specific project W2W requirements or deck arrangements. The Safeway Osprey also facilitates the transfer of liquid cargo. Regular project cargo is handled by the 3D tip hoist. The flexibility of ‘hover-mode’ allows optimum vessel headings, required for complex offshore lifting operations.
Key features Osprey
Self-containment
Continuous access
Vertical parking
Operator cabin
Gangway cover
Osprey Specifications
Load handling crane – full 3D mode
1000kg
Safe Passage Personnel – Hover mode
3 persons simultaneously
Minimum boom length
21.9 m
Maximum boom length
31.9m or 34.0m (including foldable tip)
Medium boom length
26.9 m
Bridge width (inside inner boom)
Minimum 1.1 m
Bridge width (between handrails)
Minimum 0.9 m
Bridge height (inside inner boom)
2.2 m
Vertical elevation stroke of bridge
12 m
Weight excl. HPU
Approx. 100 tonnes
Deck footprint
5,5 x 6 meter
General workability
Exceeding Hs=3.0 m
Operating air temperature
-20°C to +55°C
Max. bridge luffing stroke
20 / +20 degrees
Telescoping stroke of inner bridge
10 meter ± 5 m
Power requirement (HPU) – consumed power
Max. abt. 100kW
Required power supply
440V / 3Ph / 60Hz