Maximum versatility, minimum deck area

 

Meet Osprey. Designed for wind installation vessels

Safeway Osprey is designed to offer a state of the art offshore motion compensated gangway system for large offshore construction vessels. Self-sustained with integrated HPU and control station, the unit can be relocated at any location on any deck to meet specific project W2W requirements or deck arrangements. The Safeway Osprey also facilitates the transfer of liquid cargo. Regular project cargo is handled by the 3D tip hoist. The flexibility of ‘hover-mode’ allows optimum vessel headings, required for complex offshore lifting operations.

 

Key features Osprey

Self-containment
Continuous access
Vertical parking
Operator cabin
Gangway cover

Self-containment

Powered from the vessel, Osprey operates at any given location with integrated HPU,
control cabin, staircase etc. Vertical parking ensures it doesn’t require a boom rest.

Continuous access

Accessibility continuously possible after deployment. No need to limit to batch wise transfers.

 

Vertical parking

Vertical parking requires less valuable deck space for W2W system (5,5m x 6m).

 

 

 

Operator cabin

Even in the most challenging offshore conditions, the operator cabin ensures maximum operator wellbeing.

 

Gangway cover

Sheltered passage to work in any weather condition and operation area, always ensuring the wellbeing of your technicians.

Osprey Specifications

Load handling crane – full 3D mode
1000kg

Safe Passage Personnel – Hover mode
3 persons simultaneously

Minimum boom length
21.9 m

Maximum boom length
31.9m or 34.0m (including foldable tip)

Medium boom length
26.9 m

Bridge width (inside inner boom)
Minimum 1.1 m

Bridge width (between handrails)
Minimum 0.9 m

Bridge height (inside inner boom)
2.2 m

Vertical elevation stroke of bridge
12 m

Weight excl. HPU
Approx. 100 tonnes

Deck footprint
5,5 x 6 meter

General workability
Exceeding Hs=3.0 m

Operating air temperature 
-20°C to +55°C

Max. bridge luffing stroke
20 / +20 degrees

Telescoping stroke of inner bridge
10 meter ± 5 m

Power requirement (HPU) – consumed power
Max. abt. 100kW

Required power supply
440V / 3Ph / 60Hz

Request a demo

Would you like a real-life demostration of one of our Gangways? Part of our commissioning is performed on our wave simulator platform at out testsite. When installed on the WSP,  we can give a demo of the gangway’s functionality.

Request a demo

Would you like a real-life demostration of one of our Gangways? Part of our commissioning is performed on our wave simulator platform at out testsite. When installed on the WSP,  we can give a demo of the gangway’s functionality.